The kids both actually napped today so I was able to get some work done on a few projects. Nothing was completed while they were asleep, but multiple projects were touched. We have several things that we needed boards cut/primed/painted so I was working on that.
After the kids went to bed, Chis and I finished cutting the trim pieces for the cornice we're making for Drew's room.
We're working on the following:
- New gate for the downstairs - the hallway is 55" wide so our current gate wouldn't fit. Drew started trying to climb up the stairs this morning so it was time to block them off. Project DONE!
- Cornice for Drew's room - all pieces/sides are primed and all trim work is cut. Still need to paint everything (probably 2 coats), put the border on it, put the trim pieces on, and hand it. Oh yeah, I need to make the curtains too!
- Two of the rods in our closet need extra support. We have the new brackets but they need a trim piece added to the wall first. These needed to be cut/primed/painted before we could install them. All that is left is for them to be painted (probably 2 coats).
- We're adding 2 shelves in the closet. More cutting, priming, painting, installing to do.
- Chris' gun safe needs to be relocated from the closet to the garage. This means 2 of the shelves we hung need to be cut down to it'll fit in the corner.
Yikes.. and that is barely the start of my to-do list!